Design Systems, Inc.

World Class Manufacturing (WCM) - The Next Step Beyond "Lean"

Lean manufacturing means different things to different people, but the net result is the reduction of waste ‐ in time, money and space ‐ in the manufacturing environment. Once a lean implementation strategy is embarked upon (by definition it is never complete, as continuous improvement is just that: continuous), the next step beyond lean encompasses more than the just the manufacturing floor, it links that manufacturing floor to the entire enterprise (ERP) from the PDM (Product Data Management), MPM (Manufacturing Process Management) and the MES (Manufacturing Execution System) ‐ the "What, How and When" of lean for a truly World Class Manufacturing facility.

View the article featured in our May 2011 Corporate Newsletter, in our newsletters section!

 

Headquarters: 38799 West 12 Mile Road, Suite 100, Farmington Hills, MI 48331 | 1-800-660-4DSI (4374)
Canada: 519-944-8807 | Mexico: (011.52) 844-254-4029


DSIDSC.COM

Design Systems, Inc.
38799 West 12 Mile Road
Farmington Hills, MI 48331
800-660-4374 • 248-489-4300
Fax: 248-489-4321
Design Systems Canada LTD.
3585 Rhodes Drive Unit A
Windsor Ontario, Canada N8W5B3
800-660-4374 • 519-944-8807
Fax: 519-944-8853

Design Systems, Inc. Mexico
Phone: (011.52) 844 254 4029
Fax: (011.52) 844 431 4010
Direct Connect: 52*14*51682